PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Securing the Shear wall panels at Elev. 7-Stair -4,5, Facing South-West (800x600).jpg Welded Column at Derrick -1 Facing East (800x600).jpg Welded Column at Derrick -1 Facing South(800x600).jpg Welding columns at Derrick -1 Facing East (800x600).jpg Welding the Columns at Derrick -1 Facing South-West (800x600).jpg Steel angle for the metal decking (2nd Floor) at Elev. 1,2,3 Facing East (800x600).jpg Bolting Derrick -1 Facing west (800x600).jpg Column berore welding at Derrick -2 (800x600).jpg Steel angle for the metal decking (3rd Floor) at Elev. 1,2,3 Facing East (800x600).jpg
Previous pageNext page Welding the Columns at Derrick -1 Facing South-West (800x600)
Welding the Columns at Derrick -1 Facing South-West (800x600)